How to apply?

Shake the paint rigorously to mix the contents well

Pile length rollers must be used for application

Dip the roller head in the paint and apply to on the surface

Wait for 2 hours after application before continuing with the second coat

Drying times:

1-2 hours are required for the sealer to dry

Add Product Data Sheet + Safety Data Sheet. 

Storing

Do not expose the HQC metal paint to extreme temperatures. Storing it in a cool, dry place would be ideal.