How to apply PRO Roof Coating?
How to apply?
The application of the Pro roof coating is simple.
Open the container.
Apply it to the area
Cover with water
Your cracks will be filled
Drying times:
It will take 1-2 hours for drying completely
Add Product Data Sheet + Safety Data Sheet
Storing Paint
After use, you have to clean your brushes and other equipment, and clean water should be enough of the cleaning agent. The leftover paint must be stored in a cool, dry location, and it will help in future paint ventures or regular touch-ups. Do not store in extreme temperatures (min 7OC, max 40OC) and protect from frost.