How to apply TRADE Warmtouch paint?
How to apply?
Shake the paint rigorously to mix the contents well
Pile length rollers must be used for application
Dip the roller head in the paint and apply to on the surface
Wait for 2 hours after application before continuing with the second coat
Drying times:
1-2 hours are required for the sealer to dry
Add Product Data Sheet + Safety Data Sheet.
Storing
Do not expose the TRADE – Warm touch Paint to extreme temperatures. Storing it in a cool, dry place would be ideal.